Exterior and interior restoration of a small chapel built in 1913.
Design and construction of a timber frame structure (red pine) with galvanized steel connections, for hikers.
New planning of the top of the mountain in collaboration with the SEPAQ: foot path, driving access, plantings.
Completion: 2002